8 Inch Steel High Rise Extension S-Curved Goose Neck Shower

˂
˃
8 Inch Steel High Rise Extension S-Curved Goose Neck Shower
Price:
₦30,800
Brand: Generic
Quantity: Qty:
In Stock
Sku:
ldhvedxhary
Share:
Product Description

The S-curved arm, stainless steel material, is used to raise shower heads 8 inches while providing a perfect flow of water.

Features:

Made of stainless steel material, sturdy and solid, not easy to rust.

Silver beautiful appearance, S-curved arm, noble and generous.

It raises shower heads 8 inches making this shower arm suitable for taller individuals looking to add height to their shower.

The added height positions the shower head to provide a perfect flow of water.

20mm thread, easy to connect with the shower nozzle.

Specifications:

Material: Stainless steel

Color: Silver

Height: 200mm / 7.87in

Size: 250 * 180mm / 1.97* 7.09in

Package Weight: 227g / 8.01ounces

Package Size: 315 * 130 * 30mm / 12.4 * 5.12 * 1.18in

Packing List:

1 * S-Curve Shower Arm

1 * Round Cover


We confidently assure you'll be satisfied with what you get.However, If there's a chance that you are not satisfied with our goods or something else, please let us know before leaving us a Negative feedback. We will try our best for 100% customer satisfaction. Your 5-Star Positive Feedback is much appreciated to us, and your satisfaction is our greatest motivation to move forward.Welcome to Shop Here! Want more Items? Please come visit our SHOP.


*Shipping and Packaging All it will be double checked and well packed before sending.It will be dispatched within 5 business days after buyers pay for the order. It usually takes about 14 to 18 working days for delivering the package to the destination(for remote areas,it may take a little longer).Your satisfaction is our first priority.

*If you receive the order and it is in good condition,we would be grateful if you would leave us 5 star Positive Feedback for the transaction.

Key Features

The S-curved arm, stainless steel material, is used to raise shower heads 8 inches while providing a perfect flow of water.
Made of stainless steel material, sturdy and solid, not easy to rust.
Silver beautiful appearance, S-curved arm, noble and generous.
It raises shower heads 8 inches making this shower arm suitable for taller individuals looking to add height to their shower.
The added height positions the shower head to provide a perfect flow of water.

Product Specification
Model N/A
Production Country China
Weight (kg) 0.22
Color N/A
From the Manufacturer N/A
Care Label N/A

Reviews & Comments

Average Product rating
0.00 / 5
Rating breakdown

No Reviews yet